Skip to main content

Testing Tickets

These standards apply to every ticket moved to the Testing status in ClickUp, on all projects.

Introduced in: Sprint S43 retrospective.

1. Only move a ticket to Testing once it is deployed / built​

A ticket must not be moved to Testing until the corresponding deployment (web/backend) or frontend build (mobile app) has been done.

  • The tester must be able to test the feature immediately, on the target environment, without asking the developer for a deployment.
  • If the deployment or build is not done yet, the ticket stays in its previous status (e.g. In review).

Why: tickets were being sent to testing before the feature was actually available, which wasted testers' time and blurred the real status of the sprint.

2. Add the APK build URL to the ticket​

For mobile projects, when a ticket is moved to Testing, the developer must add the URL of the APK build that contains the change to the ticket (in a comment or the dedicated field).

  • The link must point to the build that actually includes the fix/feature.
  • If a new build is produced after a fix, update the link in the ticket.

Why: testers know exactly which build to install, and there is no doubt about which version was tested.

3. Set a deadline on tickets in Testing​

Every ticket in Testing must have a deadline (due date) by which the test has to be done.

  • The deadline is set when the ticket is moved to Testing.
  • Tickets past their testing deadline should be raised during the daily standup.

Why: without a deadline, tickets tend to stay in Testing indefinitely, which delays delivery and skews sprint progress.

Checklist before moving a ticket to Testing​

  • The feature is deployed / the build is done
  • The APK build URL is in the ticket (mobile projects)
  • A testing deadline is set