Ticket Management

These standards apply to the creation and handling of tickets in ClickUp, on all projects.

1. Developers create their own tickets in Draft​

Introduced in: Sprint S41 retrospective.

When a developer needs a ticket that does not exist yet (technical task, bug found during development, etc.), they create it themselves in the Draft column.

  • A ticket in Draft must be validated before it is worked on.
  • Once validated, it is moved into the normal workflow.

Why: needs are captured as soon as they appear, while keeping control over what enters the sprint.

2. Add story points to tickets​

Introduced in: Sprint S41 retrospective.

Every ticket must have a number of story points estimating its size/effort.

Why: story points make it possible to measure the sprint load and the team's velocity.

3. Finish tickets from previous sprints first​

Introduced in: Sprint S40 actions (reviewed in the S41 retrospective).

Unfinished tickets from previous sprints have priority over the tickets of the current sprint.

Why: tickets carried over from sprint to sprint delay deliveries and pull down the projects' progress.